Bid for: 2505 Daybreaker Drive
New Decking
$11,357.62 includes removal and disposal of existing decking, installation of new decking using composite decking with hidden fasteners and square edge in contrasting color using Trex Select or similar (entry level composite). This includes materials and labor. This does not include structural work such as joist or beam replacement.
Total job: $11,357.62
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks of start remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
Installation process:
Composite includes installation of composite decking using universal hidden fasteners, control joints for expansion and contraction at butt seams, alternating seam pattern, square edge border piece around outer edge of decking top fastened with trim head composite screws.
Decking types
Least expensive: Trex Select
Mid range: Trex Enhance, Timbertech evolutions terrain
High end: Trex Transcend
2.75% charge for credit card (in person)
3.5% charge for over the phone credit card transactions
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.
This bid is a lump sum quote. We usually buy extra materials for each job then return what we don't use. Any extra materials we may purchase are the property of Deck Stylists until used on the job itself.