Bid for: 192 South Wild Flower Circle
Beam replacement
$4,882.50 includes bracing deck, removal and disposal of existing beam, installation of new steel vertical posts and 5 x 12" glue lam. This includes labor and materials. This does not include modifications to dry space system.
Total job: $4,882.50 + actual engineering and permit cost if applicable.
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks of start remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
2.75% charge for credit card (in person)
3.5% charge for over the phone credit card transactions
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.
This bid is a lump sum quote. We usually buy extra materials for each job then return what we don't use. Any extra materials we may purchase are the property of Deck Stylists until used on the job itself.