Bid for: 12302 North Deer Mountain, Park City UT
New floating decking over membrane :
$17,435.88 This includes removal and disposal of existing decking, installation of new composite decking on top of existing membrane. This includes materials and labor.
Basic powder coated steel railing
$7,466.40 includes powder coated steel railing with metal posts. Comes in black or bronze. This includes materials and labor.
Replacing Existing Stairs:
$2,542.52 includes new stair treads on existing framing. Mid Range composite treads. This includes materials and labor.
Engineering estimated $500.00 based on actual engineering cost.
Total job $27,444.80+ actual engineering and permitting cost. This is subject to final design and engineering. This includes labor and materials.
We require 20% deposit to schedule and begin design/engineering process, 30% within 2 weeks of start remainder on completion. We may request 25% of remaining total before finish commensurate with work performed.
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.