Bid for: 8189 North High Field Road
New composite decking on decks
$12,734.40 This includes removal and disposal of existing decking, installation of new composite trex enhance or similar grade decking using hidden fasteners and solid with top screws on outer edge. This includes materials and labor.
Railing
$21,348.38 includes removal and disposal of existing railing, custom woven wire railing with 2" steel square flat bar frame on either side of 3.75" woven wire welded to top cap and posts, all steel left to rust, 4" x 1/4" steel top cap 6 x 6 x 1/4" steel posts extending 2" above cap with flat top (no finnial) with custom brackets welded on to attach to deck. This includes materials and labor.
Stairs:
$4,029.00 includes removal of existing stairs, installation of new stairs and glue lam stringers using metal stair treads. This includes materials and labor.
Solid stain
$935.00 includes solid staining joists and prior to installation of deck. This includes labor and materials.
Permit estimated $150.00 based on actual cost.
Total job $39,046.78 + actual permitting cost. This is subject to final design and engineering. This includes labor and materials.
We require 20% deposit to schedule and begin design/engineering process, 30% within 2 weeks of start remainder on completion.
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.