Bid for: 7820 La Barranca Ct, Cottonwood Heights, UT 84121
Design
$930.00 includes 3 D renderings, architectural plans, stamped engineering plans.
New footings
$5,611.45 includes removal and disposal of existing brick planter footings, installation of 8 new footings below frost line with reinforced concrete footing and pier. 6 x 6 elevated post base. This includes materials and labor.
New deck
$24,858.90 framing includes removal and disposal of existing deck, new deck framing (same footprint as existing deck) 770 square feet using pressure treated joists and ledger, glue lam beam stained and flashed, 6 x 6 wood columns.New deck decking composite decking with Trex Transcend tropical decking using hidden fasteners. Perpendicular border piece in your choice of color. Cedar facing stained. This includes materials and labor.
New railing
$7,822.84 includes installation and staining of new railing on deck and stairs with 4 x 4 wood posts, 2 x 6 cap, stainless cable railing. This includes materials and labor. This is pending final design.
Stairs
$3,636.35 includes installation of staircase 5' wide with 13 treads to lower landing using pressure treated stringers, composite treads. This includes materials and labor.
Basement floor
$10,736.39 includes removal and disposal of existing carpet, installation of moisture barrier, floating engineered hardwood flooring. this includes materials and labor.
Office floor
$2,543.40 includes removal and disposal of existing carpet, installation of moisture barrier, floating engineered hardwood flooring. this includes materials and labor.
Bedroom floor
$3,689.95 includes removal and disposal of existing carpet, installation of moisture barrier, solid prefinished hardwood flooring. this includes materials and labor.
Total job: $58,437.83
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks prior to start, remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
Installation process:
Composite includes installation of composite decking using universal hidden fasteners, control joints for expansion and contraction at butt seams, alternating seam pattern, square edge border piece around outer edge of decking top fastened with trim head composite screws.
Redwood decking installation includes using a perpendicular border piece to conceal all end grains, pre-stain on 5 sides prior to installation, installation of decking with pilot holes on all board ends and buff sand, acid wash and pressure wash prior to final staining top deck surface.
Hardwood decking installation using #8 trim head stainless steel screws, prestained on 5 sides prior to installation, buff sand, acid wash and pressure wash prior to final staining top deck surface. We can also do plugs or hidden fasteners for an additional price.
Decking types
Least expensive: Trex Select
Mid range: Trex Enhance, Timbertech evolutions terrain
High end: Trex Transcend
2.75% charge for credit card (in person)
3.5% charge for over the phone credit card transactions
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
Professional, courteous and clean crew.
Highest quality products and state of the art building, sanding and staining techniques.
Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.
This bid is a lump sum quote. We usually buy extra materials for each job then return what we don't use. Any extra materials we may purchase are the property of Deck Stylists until used on the job itself.