675 Deer Valley Drive
Grey Hawk Condos
Fascia
$4500.00 includes scraping and repainting fascia on all horizontal (not peaks) fascia on all buildings excluding any with gutter.
Railing replacement unit 2 12 feet railing replacement
$1420.00 includes removal and disposal of existing railing section, installation of new railing using peeled log top and bottom with channel for 1 x 6 cedar vertical planks painted (match existing). This includes materials and labor. Does not include posts.
Total bid: $5920.00 includes all materials and labor.
We require 50% deposit to schedule work.
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.