Bid for: 4540 S Zarahemla Dr.
Hardwood removal
$936.00 includes removal and disposal of existing tile and hardwood in kitchen, dining and entry.
Carpet removal
$676.80 includes removal and disposal of carpet and tack strips in areas getting hardwood.
Hardwood floor
$25,444.58 includes removal and salvage or disposal of existing base. Installation of smooth (non handscraped) hickory in "saddle" color (medium brown. This includes materials and labor. This does not include new base.
Stairs
$6,930.00 includes installation on treads and risers of smooth (non handscraped) hickory in "saddle" color (medium brown. Skirt board replacement and painting. This includes materials and labor.
Railing
$2,912.32 includes installation of new banister and railing in entry with steel frame and stainless cable and hardwood top cap. This includes materials and labor.
Total job $36,899.66 This is subject to final design and engineering. This includes labor and materials.
Add $5492.00 for hand scraped hickory.
We require 20% deposit to schedule and begin design/engineering process, 30% within 2 weeks of start remainder on completion. We may request 25% of remaining total before finish commensurate with work performed.
This quote does not include sub surface issues such as rotted sub floor.
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.