Bid for: 591 Summit Drive
Replace vertical deck columns
Steel posts: 4 x 4
$6,743.00 includes bracing deck, removal and disposal of existing log columns, installation of new 4 x 4 steel columns with top and bottom mounting plate, powder coated. This includes materials and labor.
Replace railing All steel posts and turnbuckle hardware
$13,385.00 includes removal and disposal of existing railing and posts, installation of new stainless cable railing with steel 1 x 2 posts and 1 x 6 hardwood cap. Turnbuckle tensioners. This includes materials and labor.
Deck extension
$6,624.08 includes concrete deck extension on west side of deck to make it same width as the rest of the deck. (approximately 15 x 6). This includes materials and labor.
New stairs
$6,643.30 includes removal and disposal of existing stairs, installation of new stairs along outer edge of deck extension with landing and turn. Glue lam or steel treads. Cable railing to match new railing. This includes materials and labor.
Total job: $33,395.38
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks prior to start, remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
2.75% charge for credit card (in person)
3.5% charge for over the phone credit card transactions
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
Professional, courteous and clean crew.
Highest quality products and state of the art building, sanding and staining techniques.
Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.
This bid is a lump sum quote. We usually buy extra materials for each job then return what we don't use. Any extra materials we may purchase are the property of Deck Stylists until used on the job itself.