Deck Stylists

Specializing in high altitude decks since 2003

Mobile - 435.513.0658

Design - Construction -Restoration - Maintenance

Working in Park City, Salt Lake. If you have a deck problem we can solve it.

At Deck Stylists we strive for excellence in our both our building and our business practices.

Bid for: 2057 Mahre Drive

New decking on existing deck: 

$11,169.00 This includes removal and disposal of existing decking, installation of new composite decking in Trex Enhance 'beach dune' with Trex Transcend tropical in 'lava rock' for the border using hidden fasteners. This includes materials and labor. 

Extension 4 feet x 25 feet off of existing deck

$5,768.00 this price includes installation of additional beam (GLB),  joists spaced 16" on center and stained to match existing framing, new composite decking in Trex Enhance 'beach dune' with Trex Transcend tropical in 'lava rock' for the border using hidden fasteners. This includes materials and labor. 

Cable Railing

$10,477.74 includes powder coated steel posts, stainless steel cable railing with turnbuckle tensioners, hardwood 1 x 6 top cap.  (See previously attached photo) This includes materials and labor. 

Stairs: 

$3,031.20 includes removal of existing treads, reinforcement of bottom footing, installation of galvanized steel treads. This includes materials and labor. see attached picture 

Shade pergola:

$2,993.80 includes installation of rough sawn wood frame with steel brackets, 2 x 10 cross beams and 2 x 4 top lattice. Pre stained prior to installation. This includes materials and labor.  See pictures in email and drafts. 

Rain escapes (water proof ceiling above lower deck). 

$3,550.40 includes installation of Trex Rain escapes above hot tub this includes removal of existing ceiling structure and downspout also. This includes materials and labor. 

Tongue and groove cedar soffit:

$1750.00 includes installation of tongue and groove soffit pre stained prior to installation and stained after installation. This includes materials and labor.  

Gate with closure at top of stairs

$490.00 includes fabrication of steel framed gate with stainless steel cable and tensioners to match railing. Vertical post with mounted clasp in tiger wood 4 x 4. This includes materials and labor. 

Total job $39,230.14actual engineering and permitting cost. This includes labor and materials. 

We require 20% deposit to schedule and begin design/engineering process, 30% within 2 weeks of start remainder on completion. We may request 25% of remaining total before finish commensurate with work performed. 

10% off maintenance for each referral 

Read reviews of our company here

Some points about our business:

  • Professional, courteous and clean crew.
  • Highest quality products and state of the art building, sanding and staining techniques.
  • Construction and restoration with and eye toward lifetime maintenance means your deck will
    look amazing for years.

If you would have questions or would like to schedule work please feel free to call or email. 

Call now for a free estimate!

Mobile: 435.513.0658

 

Remodeling and Home Design

Copyright 2015 | All Rights Reserved | Website by Powered On Innovations.