Bid for: 4284 hidden cove
New Railing
$4,978.79 includes removal and disposal of existing railing on front deck, installation of new 8-10" peeled log posts and 5" horizontal peeled logs coped (match back railing) with stainless cable with turnbuckles. This includes materials and labor. This includes using (4) small intermediary posts instead of log posts as discussed.
New stair treads
$360.00 includes removal and disposal of existing stair treads, installation of new steel perfo grip galvanized stair treads. this includes materials and labor.
Total job: $5,338.79 + actual engineering and permit cost if applicable.
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks prior to start, remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
2.75% charge for credit card (in person)
3.5% charge for over the phone credit card transactions
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
Professional, courteous and clean crew.
Highest quality products and state of the art building, sanding and staining techniques.
Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.
This bid is a lump sum quote. We usually buy extra materials for each job then return what we don't use. Any extra materials we may purchase are the property of Deck Stylists until used on the job itself.