Bid for: 1752 Browning Ave
Modify all of remaining railing
$7,390.87 includes removal and replace railing modify railing with 1/4" square baluster and addition of bottom foot to drill into concrete. Sand blast and powder coat weathered brown. This includes materials and labor.
Modify railing for extension
$1,837.32 includes modify existing upper deck railing to extend out 1-2 feet with vertical 2" square post and extensions and returns needed to accomodate extension. This includes materials and labor.
Total job: $9,228.19
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks of start remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
2.75% charge for credit card (in person)
3.5% charge for over the phone credit card transactions
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.