Bid for: 2165 Twighlight Court
Decking replacement:
$5,665.43 includes removal and disposal of existing decking, installation of new decking using composite decking with hidden fasteners and square edge perimeter in contrasting color using Trex Enhance or Timbertech Earthwood Evolutions. This includes materials and labor. This does not include structural work such as joist replacement.
Installation process:
Composite includes installation of composite decking using universal hidden fasteners, control joints for expansion and contraction at butt seams, alternating seam pattern, square edge border piece around outer edge of decking top fastened with trim head composite screws.
Joist addition
$1,663.85 installation of new joists in between existing joists using pressure treated 2 x 8. This includes materials and labor.
Total job: $7,732.84 includes labor and materials.
We require 25% deposit to schedule and begin design/engineering process, 25% within 2 weeks of start remainder on completion. We may request an additional payment of 25% of remaining total before finish commensurate with work performed.
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.