Bid for: 440 wasatch way, park city
Remodel Front Deck
$8,112.00 includes construction of 208 square foot deck with stairs down both ends in entry. This includes 3 footings, beam, pressure treated joists, redwood decking prestained on 5 sides prior to installation, sanded, acid washed, stained on top in your choice of tint. This includes materials and labor.
$8,112.00+ actual engineering and permitting cost. This includes labor and materials.
We require 20% deposit to schedule and begin design/engineering process, 30% within 2 weeks of start remainder on completion. We may request an additional 25% after framing or decking and before completion commensurate with work completed.
10% off maintenance for each referral
Read reviews of our company here
Some points about our business:
- Professional, courteous and clean crew.
- Highest quality products and state of the art building, sanding and staining techniques.
- Construction and restoration with and eye toward lifetime maintenance means your deck will
look amazing for years.
If you would have questions or would like to schedule work please feel free to call or email.